Project Details
Centralized Issue Facility Storage Building Renovation & Addition
Springfield, IL
11,800
Project Description
Oculus Inc. was the Architect of Record for this Design-Build, turnkey 5,000 GSF addition and an approximately 6,800 GSF renovation to the USPF&O Warehouse. Renovation of the existing warehouse at the Illinois National Guard Camp Lincoln, Springfield, IL included managing the design team, design; production and coordination of drawings, specifications, calculations, reports; and construction administration.
The building includes temperature control, a poured concrete floor, ventilation, lighting, and electricity. The renovation work includes walls, doors painting, wall demolition, re-routing of electrical, communication and plumbing lines, modification and addition to gas piping, moving lighting, locating new power panels, and telecom conduit. This is the Hazardous Storage Building for the CSMS.